Skip to main content

Posts

Featured

November 2018

The big item of progress in November has been the windows, which we completed, finally closing in the house. The exterior of the windows are a mixture of silver metallic, copper metallic, and flat black, which should add a nice visual interest to the outside of the house. The interiors of the windows are all pre-finished, clear coated pine. All the exterior doors are glass, also came from the window company, and are finished the same. Having the windows in has really helped understand what the spaces are going to feel like. We are very much looking forward to being able to sit in the finished house and look out at the view as the light changes throughout a day. Work inside has been proceeding all month. Above, you can see the framing for the end wall of the living area. The entire width of the wall will be built in cabinets and shelves, with the two openings to the room from the entry hall passing though the built-ins. We will also have a propane fireplace in

Latest Posts

Container Shed

Tower

Catch Up Post